Construction
Renovation Budget Tracker
Set a renovation budget by room and category, then track actual spend so the project doesn't run away from you.
- Delivery
- Instant download
- Purchase
- One-time payment
- Format
- Google Sheets
- Excel
- Updated
- August 2026
Total spent
$45,060
Contingency verdict
Spent and overdrawn
- Room budgets$48,000
- Contingency fund (10%)$4,800
- Drawn from contingency$5,150 — overdrawn
- Rooms not started1
Sample data preview of the Renovation Budget Tracker spreadsheet, shown for illustration only.
What this spreadsheet does
Renovation costs come in waves from different contractors and stores, and without a running total it's easy to overspend before the project is done.
What you can do with it
- Set a renovation budget before work begins
- Keep a structural surprise from making a room look over budget
- See how much contingency is left before agreeing to the next change
What's included
Sheet tabs
- Instructions
- Summary
- Budget by Room
- Payment Log
Features
- Budget per room, with spend pulled from the payment log
- Contingency held as a separate pot, not as spare room budget
- Every payment records whether it came from the budget or the contingency
- Per-room status: on track, not started, or over budget
- Contingency remaining and a plain-English verdict on how much of it is gone
- Spend broken down by category
How it works
- 1Set a budget per room, and a contingency percentage on top
- 2Log each payment and say whether it came from the budget or the contingency
- 3Watch two numbers on the Summary: budget left, and contingency left
Who it's for
Homeowners and small contractors managing a renovation budget.
These spreadsheets are cost and planning tools. They do not provide structural engineering, permit or code-compliance approval.
Frequently asked questions
Does it include a contingency fund?
Yes, and it is deliberately kept out of the room budgets. If a structural surprise is paid from the kitchen's budget, the kitchen reads over budget and the contingency reads untouched — and both are false.
What counts as a contingency draw?
Something nobody could have quoted for: rotten joists under a floor, asbestos found during a strip-out. A change you chose is not a surprise, and it belongs to the room.
How do I know if the project is in trouble?
The contingency verdict. A project that has spent most of its contingency in month two is in trouble even while every room still reads on track.
Complete the setup
The rest of the tools this one was built to sit beside.
Construction Job Costing Spreadsheet
Track labor, materials and subcontractor costs against the job budget.
- Google Sheets
- Excel
Construction Bid Estimator
Build a bid from materials, labor and markup in one worksheet.
- Google Sheets
- Excel
Change Order Tracker
Log every change order with cost impact and approval status.
- Google Sheets
- Excel
Similar tools
The same kind of tool, for a different job.
First Home Setup Budget
Buy in the order things are needed, not the order they are noticed.
- Google Sheets
- Excel
ADHD-Friendly Budget Tracker
One simple page, dark mode, no categories to overthink — just log and see your balance.
- Google Sheets
- Excel
Christmas Gift Budget Tracker
Plan gifts and budget per person, then track what's bought and wrapped.
- Google Sheets
- Excel
2027 Annual Budget Planner
Monthly budgets, bill calendar, savings goals and net worth tracking for the full year.
- Google Sheets
- Excel
Monthly Budget Planner
Income, transactions and category limits compared automatically each month.
- Google Sheets
- Excel